In floor renovation projects, the saying goes: "30% materials, 70% substrate preparation." If the old concrete substrate is not treated correctly, the subsequently applied floor coating is highly likely to peel or delaminate. Zhongren floor grinders, combined with the right selection of grinding pads, are key to giving the substrate a "new lease on life."
![]()
1. Phase 1: Coarse Grinding—Removing Old Coatings and Loose Layers
Use a Zhongren heavy-duty floor grinder equipped with metal-bond diamond pads.
Pad Recommendation: Select 16# or 30# coarse-grit diamond pads.
Objective: Rapidly remove surface oil, old epoxy layers, and loose concrete surface material to expose the solid substrate and increase surface roughness, thereby enhancing coating adhesion.
2. Phase 2: Fine Grinding—Eliminating Scratches and Leveling
Switch to 50# or 100# metal-bond pads and perform cross-grinding.
Objective: Eliminate deep scratches left by coarse grinding and fine-level localized unevenness to ensure uniform thickness for the subsequent floor coating.
3. Phase 3: Transition Grinding—Final Preparation for Coating
If superior flatness is required, it is recommended to use resin-bond pads for a 200# grinding pass.
Zhongren Advantage: Our grinders feature multi-head planetary rotation technology, ensuring consistency across large areas and preventing localized over-grinding.
![]()
Expert Tip: Always use dust extraction equipment to remove dust before applying floor paint. Zhongren grinders are equipped with dust extraction ports to enable dust-free operation, protecting the environment and improving construction quality.